Least-squares adjustment for total-station control networks. Bring together JobXML and 12d field files, review the network and export adjusted control.
Runs on your PC; works up to 44 days offline between free licence check-ins. Advisory output; the surveyor decides.
Review recorded survey setups, residuals, checks and point rows against user-entered limits, with browser-local advisory findings and print, JSON and CSV reports.
You set the limits. Findings stay linked to their source.
Bearings, distances, scale and radial field preparation.
07 tools
Calculation reference
01.01
COGO Calculator — Bearing, Distance & Area
Join, radiate and polygon area from grid coordinates, with the full working for every step and the grid-vs-ground area note. Free advisory working aid.
Solve bearing-bearing, bearing-distance and distance-distance plane intersections with every forward candidate, radial back-checks and full working shown.
Point and line scale factor, height factor and combined scale factor for MGA2020 — convert grid and ground distances both ways with the full working shown.
Prepare grid bearings, horizontal distances and clockwise backsight angles for design points, then print the field sheet or download its browser-local CSV.
Loop closure and project-selected working comparisons.
03 tools
Calculation reference
03.01
Level Loop Closure Checker
Level loop misclose against a project-selected C√K guideline, with advisory distribution and the full working. No survey order or jurisdiction is inferred.
Convert GDA2020 lat/long to MGA2020 and back, or bring nationally conformal GDA94 to GDA2020 first. Zone, point scale factor and grid convergence shown.
A printable, per-state checklist of questions to ask before a survey package leaves the office. Advisory prompts only — it never decides anything for you.
Review recorded setups, residuals, checks and point rows against your own limits, with browser-local advisory findings and print, JSON and CSV reports.
These pages provide advisory working output from the inputs you provide. Where a guideline applies, wording is limited to “within guideline” or “exceeds guideline — review”. Advisory output — confirm independently before reliance.