Datum & Metadata Quick-Check
Free advisory tool: it shows its working, and a registered surveyor must confirm any output before it is relied on. Safety & scope
Paste the header or metadata lines from two or more project files — a control listing, a point-file banner, a plan title block — and compare the datum, MGA zone, geoid model and epoch each one declares. Disagreements are highlighted for review; a header that states nothing is reported as not stated, never guessed.
Uses only this tool title and its public link. Inputs, results, coordinates and filenames are not included. Sharing starts only when you press the button.
Advisory output. Confirm independently before reliance.
Paste header text from at least two files to compare what each one declares.
How to compare survey datum metadata
Paste metadata declarations from at least two project sources and review the field-by-field comparison without inferring unstated values.
Collect the declared header text
Copy only the datum, zone, geoid and epoch lines from each project source you want to compare.
Paste and label each source
Paste at least two header blocks, add optional source labels, or load the fictional worked example.
Chase differences at the source
Review every compared field, missing declaration and difference, then return to the original files to determine the correct project metadata.
Questions about Datum quick-check
What does a survey datum metadata check in Australia compare?
This quick check compares what pasted source headers state for datum, MGA zone, geoid model and epoch. It reports missing declarations and differences without guessing a value.
Can it compare GDA2020, GDA94, MGA zone and AUSGeoid text?
It recognises the supported naming patterns shown by the tool and places the parsed declarations side by side. The source header can still differ from the coordinate data it describes.
Does the comparison decide which metadata value is right?
No. It only highlights agreement, differences and absent declarations. The correct datum, zone, geoid and epoch must be established from authoritative project sources.